
ST-2213
The ST-2213 project spans a total of 213 m² and features a 5+1 room layout with a closed kitchen in a double-story steel construction. Proudly referred to as the crown jewel of our portfolio, this project embodies the very essence of luxurious living. It has been meticulously designed for our exceptional clients who have high standards and always seek the best. With every detail carefully crafted, this model offers a perfect balance of elegance, functionality, and exclusivity.
The installation of prefabricated and steel structures is done very quickly.
With low costs, they are structures that fit your budget.
It is resistant to natural disasters such as earthquakes and fires.
WORKS UNDER THE RESPONSIBILITY OF OUR COMPANY
- Interior and exterior paints (in the desired color)
- Installing the outer door (Steel door)
- Installing interior doors (American door)
- Installation of all windows with double double glazing without PVC joinery
- All of your sanitary (water) installations will be pulled out as you will connect (Tests will be done and delivered)
- All of your electrical installations will be pulled out as you will connect (Tests will be done and delivered)
- Supply of sanitary ware and armature groups (After the wet floor is prepared, the installation is done by the customer)
- Roofing and roof insulation, as well as stream landings and gutters, will be installed in their places
WORKS UNDER THE RESPONSIBILITY OF OUR CUSTOMER
- Ground concrete, all kinds of excavation works and landscaping
- Floor and wall covering works (screed, ceramic, tile, carpet, etc.)
- Permits required for the establishment of the building
- External connections outside the building (electricity, waste water and clean water, meters)
- Covering the accommodation and food expenses of the assembly team
- Kitchen upper and lower cabinets
- Shipping and shipping insurance